Drawworks
Gardner Denver 1500-E (2000 hp)
(2) EMD 79 traction motors (1000 hp each)
1 3/8" drill line, Eaton 336 auxillary brake
Power
(3) Caterpillar 3512 engines w/ 1050 kw generators
SCR System
Nov Ross Hill 1400 3 x 4 SCR house
Mast
Pyramid 142' w/ 890,000 # capacity on 12 lines
Substructure
Pyramid 30' box on box
KB 31' Rotary beam clearance 25'
Block Hook
Skytop Brewster (500 ton) block
B. J. (550 ton) hook
Auxillary Equipment
Pason EDR (base system)
Fuel tank - 17,625 gallon capacity
Water tank - (2) 540 barrel capacity each
Rig Manager and crew quarters
NOV ST-80 iron roughneck
Pilot II automatic driller
Mathey survey unit
Man rider
Photos for this equipment to be shown on request
Gardner Denver 1500-E (2000 hp)
(2) EMD 79 traction motors (1000 hp each)
1 3/8" drill line, Eaton 336 auxillary brake
Power
(3) Caterpillar 3512 engines w/ 1050 kw generators
SCR System
Nov Ross Hill 1400 3 x 4 SCR house
Mast
Pyramid 142' w/ 890,000 # capacity on 12 lines
Substructure
Pyramid 30' box on box
KB 31' Rotary beam clearance 25'
Block Hook
Skytop Brewster (500 ton) block
B. J. (550 ton) hook
Auxillary Equipment
Pason EDR (base system)
Fuel tank - 17,625 gallon capacity
Water tank - (2) 540 barrel capacity each
Rig Manager and crew quarters
NOV ST-80 iron roughneck
Pilot II automatic driller
Mathey survey unit
Man rider
Photos for this equipment to be shown on request
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.